Accessibility options Narration, visual guidance and readable text to make the content easier to access.
This page can tell its story.
Narration and visual guidance available.
THE HUMAN STORY BEHIND TWEFDA

A PROBLEM.
A QUESTION.
A DIFFERENT WAY TO SEE VALUE.

Before TWEFDA became a protected technology platform, two ideas had already taken root in my mind. They came from different moments, taught different lessons and, years later, converged when I began looking at offshore decommissioning in a different way.

Javier Dominguez, founder and inventor of TWEFDA
01 · TWO IDEAS THAT STAYED WITH ME
One problem.
More than one way
to create value.

Years before TWEFDA existed, I was leading a maintenance department in the Iberian pork industry. There I met an entrepreneur, Carvajal, who managed industrial by-products that created a disposal problem but also contained valuable fats.

Carvajal gave me an idea that stayed deeply rooted in my mind: look for a business with two commercial streams — the main activity, and another opportunity hidden in what the first activity leaves behind. In his case, a difficult by-product could also become a valuable raw material.

Years later, during a masterclass with Dr John Park as part of Business Gateway’s Grey Matters programme, I encountered a different idea. He explained that the reason for a business often begins with a P: it can relieve a Pain for a customer, or provide a Pleasure for another customer.

Neither idea, on its own, tells the story of TWEFDA. But both remained in my mind. Much later, when I began thinking about offshore decommissioning, they converged: could something that had become a problem for one party be repurposed into something useful — perhaps creating more than one value stream for others?

02 · THE OFFSHORE QUESTION

YEARS LATER, DECOMMISSIONING LOOKED LIKE THE SAME KIND OF PROBLEM — ONLY MUCH BIGGER.

Offshore oil and gas assets eventually reach the end of their original purpose. Removal is difficult, expensive and resource-intensive. I began asking whether some of those assets could have a second life instead of being treated only as something to dismantle.

Then another question appeared. If very large masses offshore could be made to reciprocate with waves, could that motion itself become part of a new energy opportunity? That was the point where asset repurposing began to merge with wave energy, storage and system design.

PAIN

Decommissioning, stranded infrastructure, unused mass and an energy system that needs more flexibility.

POSSIBLE VALUE

Repurpose what already exists, add new energy functions and create more than one route to useful value.

03 · FROM IDEA TO PROTECTED DEVELOPMENT

TECHNOLOGY CHANGED. THE ORDER OF PRIORITIES BECAME CLEARER.

The milestones below separate what has already happened from what still depends on validation, funding and commercial progress.

Achieved milestone Planned / conditional next step
29 JUL 2016

First NDA signed

The early concept entered protected development.

08 JAN 2018

TWEFDA incorporated

TWEFDA Limited was incorporated in Scotland as SC585091.

15 MAY 2018

Grey Matters

Business Gateway entrepreneurial programme.

01 DEC 2020

Scotland Unlocking Ambition

A further stage in entrepreneurial development.

04 JUN 2021

UK priority

GB 2108002.3 established the priority date for the international filing.

12 MAY 2022

RGU Accelerator

Further acceleration of the company and proposition.

01 JUN 2022

PCT filed

PCT/GB2022/051391 filed internationally by TWEFDA Limited.

08 DEC 2022

PCT published

WO 2022/254208 A1 published as COMBINED WAVE ENERGY CONVERTER AND GRID STORAGE.

2026

European protection expands

EP4348036B1 granted. Unitary effect registered and Spanish validation published.

EUROPEAN PROTECTION FOOTPRINT
UNITARY PATENT

18 EU Member States

Unitary effect is registered across 18 participating EU Member States.

Show the 18 states

Austria, Belgium, Bulgaria, Denmark, Estonia, Finland, France, Germany, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Portugal, Romania, Slovenia and Sweden.

SPAIN

National validation published

Spanish protection published as ES 3076907 T3 on 24 August 2026.

UNITED KINGDOM

Application pending

UK protection remains under prosecution and is not presented here as granted.

WHAT COMES NEXT · PLANNED / CONDITIONAL
NEXT VALIDATION MILESTONE

Prototype + controlled testing

Physical validation of the WCE mechanism in a controlled environment.

COMMERCIAL TAKE-OFF

Funding + commercialisation

Use technical evidence to support licensing, royalties and market engagement.

LONGER TERM

Manufacturing network

A qualified manufacturing network or consortium can emerge as deployment scales. No fixed date is presented as a commitment.

04 · THE IDEA BECAME A PLATFORM

THE ORIGINAL QUESTION WAS ABOUT REPURPOSING. THE DEVELOPMENT GREW FAR BEYOND A SINGLE USE.

Repurposing decommissionable offshore assets remains part of the long-term vision. But the technology evolved into a broader system of energy functions, devices and control concepts. ESWave, Generation and Storage, Weight-Changing Energy, the TWEFDA Association and the Hub are not separate inventions stitched together afterwards. They are stages in the expansion of the same underlying question: how can an offshore asset become more useful over time?

01

Repurpose

Give suitable offshore infrastructure a possible second life.

02

ESWave

Create a device able to participate in more than one energy function.

03

Association

Coordinate several devices so the system can respond at a wider level.

04

Hub

Connect generation, storage and offshore infrastructure through a shared system interface.

The technology remains under development. Physical prototype and controlled tank validation remain important next steps for the WCE route.

05 · WHAT DID NOT CHANGE

TECHNOLOGY CHANGED. THE ORDER OF PRIORITIES BECAME CLEARER.

“Something badly designed can mean a lifetime of frustration for those who use it. Something well designed can mean a lifetime of enjoyment.”
— Javier Domínguez

Design decisions outlive the moment in which they are made. That principle has followed me throughout my engineering career, and the same discipline shapes how I approach TWEFDA.

The founder story is not only about where an invention came from. It is also about what the company is trying to optimise for. TWEFDA’s current decision hierarchy is Planet, People, Myself and Profit.

Profit matters because it gives the company the capacity to continue: to employ people, protect ideas, test technology and reward capital and risk. But it comes after the larger systems the company is intended to serve.

PLANETPEOPLEMYSELFPROFIT

TWEFDA priorities diagram showing Planet, People, Myself and Profit
06 · TWEFDA TODAY

THE COMPANY IS STILL FOUNDER-LED. THE DELIVERY NETWORK IS MUCH LARGER THAN ONE PERSON.

I am a marine engineer, inventor and entrepreneur. Today I lead TWEFDA as the owner and developer of the wider IP platform. The company works with specialist engineers, consultancies, universities, commercial partners and other organisations when specific capability is needed.

The first focused commercial route is now WaveAmp, created to take Weight-Changing Energy toward validation and commercialisation in Europe while TWEFDA retains the broader technology platform.

Founder-led

Javier Dominguez remains TWEFDA’s founder, inventor and Managing Director.

IP-led

TWEFDA retains the underlying platform IP and development leadership.

Partner-enabled

Specialist capability can be brought in without turning TWEFDA into the EPC or manufacturer.

07 · THE STORY CONTINUES

THE ORIGINAL IDEA WAS TO TURN A PROBLEM INTO SOMETHING USEFUL. THAT IS STILL THE TEST.

TWEFDA is not finished, and this story should not pretend otherwise. The patent family, modelling and preliminary studies provide a foundation. Physical validation, commercial proof and wider deployment are the work ahead.